Today I machined out the housing for the relocation shifter. It was machined out of a piece of 2 1/2” x 3 1/2” 6061.

T5-Shifter-Relocation Housing-2

It will be welded to the housing once everything is fitted properly. The shaft will be cut once I have it set up and dowel pins will be used along with the set screws.

T5-Shifter-Relocation Housing-1

showing the new leveled housing.

T5-Shifter-Relocation-Housi

Showing the completed coupling with the shaft cut out to allow the shifter ball to fit into the socket.

 

Finished the housing and welded it into place and installed the shifter.

T5-Shifter-Relocation-compl